Skip to content

Kenya Survey Standards Reference

Permitted errors, datums, UTM zones, traverse and levelling accuracy standards, and survey marks

Survey Regulations 1994 (L.N. 168)  |  Survey Act Cap 299  |  RDM 1.1 (2025)

Measurement Units (Reg 23)

linear
metres
angular
degrees-minutes-seconds (DMS)
area
square metres and hectares
height
metres above mean sea level

Permitted Errors (Reg 27)

Measurement TypePermitted Error
baseline1:25000
angles10 seconds
chaining1:3000
tacheometry1:1000
leveling10√K mm

Datums & Projections (Reg 24)

Arc 1960
Code: ARC1960
Ellipsoid: Clarke 1880
Projection: UTM
WGS 84
Code: WGS84
Ellipsoid: WGS 1984
Projection: UTM
Minna
Code: MINNA
Ellipsoid: Clarke 1880
Projection: UTM

Kenya UTM Zones

Zone 35N
Turkana (North)
Zone 36N
Western Kenya (Kisumu, Eldoret)
Zone 36S
Central Kenya (Nakuru, Kericho)
Zone 37S
Eastern & Southern Kenya

Traverse Accuracy Standards (RDM 1.1 Table 5.2)

OrderPrecision RatioDescription
First Order Class I1 : 20,000Very high precision geodetic control
First Order Class II1 : 10,000High precision geodetic control
Second Order Class I1 : 5,000Primary control survey
Second Order Class II1 : 2,500Secondary control survey
Third Order1 : 1,000Cadastral and detail survey

Levelling Accuracy Standards (RDM 1.1 Table 5.1)

OrderAllowable MisclosureDescription
First Order4√KPrecision levelling - benchmarks
Second Order Class I6√KEngineer levelling
Second Order Class II8√KTechnical levelling
Third Order10√KCadastral survey levelling
Fourth Order20√KDetail survey elevations
Note: For RDM 1.1 compliant Kenya road surveys, use Third Order (10√K mm) as minimum standard.

Survey Marks (Reg 37-47)

PSCPermanent
Primary Survey Control
Concrete pillar with brass plate, established by Survey of Kenya
Reg 14(1)
PSC-FPermanent
Primary Survey Control (Flush)
Primary control mark flush with ground surface
Reg 14(2)
SSCPermanent
Secondary Survey Control
Concrete pillar or bench mark of secondary order
Reg 15(1)
TSCTemporary
Tertiary Survey Control
Temporary control mark, iron pin or nail
Reg 16(1)
MNTemporary
Masonry Nail
Nail in masonry, concrete or rock
Reg 17(a)
IPTemporary
Iron Pin
Iron pin driven into ground
Reg 17(b)
WPTemporary
Wooden Peg
Temporary wooden peg for boundary delineation
Reg 17(c)
CBPermanent
Concrete Beacon
Concrete boundary beacon with centre mark
Reg 17(d)
INDTemporary
Indicatory Beacon
Indicatory beacon (not a physical corner mark)
Reg 18
RVPermanent
Rivet
Brass or steel rivet in rock or concrete
Reg 17(e)
BMPermanent
Benchmark
Permanent benchmark referencing Kenya National Datum
Reg 20(1)
TBMTemporary
Temporary Benchmark
Temporary benchmark for short-term surveys
Reg 20(2)
FBPermanent
Flush Bracket
Flush bracket on wall or permanent structure
Reg 20(3)

Survey Regulations Index

RegulationPartTitleDescription
Reg 14VPrimary Survey ControlEstablishment of PSC marks
Reg 15VSecondary Survey ControlEstablishment of SSC marks
Reg 16VTertiary Survey ControlEstablishment of TSC marks
Reg 17VBoundary MarksTypes of boundary marks
Reg 18VIndicatory BeaconsWhen indicatory beacons are used
Reg 20VBenchmarksPermanent and temporary benchmarks
Reg 21VSpecial MarksRoad nails, spikes, railway marks
Reg 22VNatural FeaturesTrees, rocks as reference marks
Reg 24VCoordinate SystemsSystems of coordinates and projections
Reg 27VPermissible ErrorsMaximum allowable measurement errors
Reg 37VISurvey Marks DesignDesign and specification of survey marks
Reg 38VIPlacement of MarksPlacement of survey marks
Reg 47VIMissing BeaconsProcedure for missing beacons
Reg 51VIITraverse SurveysGuiding principle for traverses
Reg 52-59VIITriangulation & TraverseMethods for control surveys
Reg 99VIIIDeed Plan RequirementsSpecifications for deed plans
Reg 100-108VIIIPlan Drawing StandardsDrawing specifications for plans

Quick Reference

Deed Plan (Reg 99-108)

  • • Scale: 1:500 to 1:5000
  • • North arrow required
  • • All boundaries numbered
  • • Area in sq m and hectares
  • • Beacon schedule required

Control Survey

  • • Min 2 control points for detail
  • • Traverse closure ≤ 1:10,000
  • • Level run ≤ 10√K mm
  • • Coordinates in UTM ARC1960

Quick Compute